Montel News Iberia 19.06.2025 If the conventional plants planned as backup technologies on April 28 had fulfilled their obligations, 19. June 2025 Ukategorisert the blackout could have been avoided, said TSO Red Eléctrica Post navigation Previous Previous post: 19.06.2025 Montel News Iberia Insufficient capacity of power plants to manage “surge” issues in the grid,Next Next post: 19.06.2025 PV Magazine Iberia The system operator has located the origin of the blackout in “the malfunction” of a photovoltaic plant in Badajoz –