Protected: post 12345
13. August 2026
There is no excerpt because this is a protected post.
Protected: fffffffffff
13. August 2026
There is no excerpt because this is a protected post.
23.07.2026 PV Magazine Espana Spain’s PV asset market is entering a stabilization phase after two years of valuation declines, with operational solar assets averaging €596,000/MW.
23. July 2026
Investors are increasingly favoring projects with regulated revenues, PPAs, and battery storage potential as merchant assets face pressure from falling capture prices.
21.07.2026 Revistas Energias Renowables, Spain It combines an 8 MW #fotovoltaica plant with an 8 MWh #baterías #almacenamiento system, reaching a total installed capacity of 16 MW,
21. July 2026
and has an investment of 2 million euros financed with European Next Generation funds. The battery installed in Arico (Tenerife) makes it possible to store
16.07.2026 PV Magazine Espana Record negative prices in Spain: 596 hours place it at the top of Europe in the first half of the year.
16. July 2026
Solar breaks records in Europe in the second quarter of 2026, but triggers volatility and highlights the system’s flexibility deficit, according to Montel’s Q2 European
13.07.2026 Montel News A draft seen by Montel shows the European Commission wants to add 100 GW of renewable energy capacity each year until 2030,
13. July 2026
around 40% more than the current rate, with a view to slashing EU gas demand by two thirds by 2040. Under its electrification plan to be

Respondo AS