and has an investment of 2 million euros financed with European Next Generation funds. The battery installed in Arico (Tenerife) makes it possible to store the surplus energy produced during the hours of peak photovoltaic generation, to conserve them when the system operator temporarily limits the evacuation of energy and to subsequently supply them to the grid when demand increases or the system requires it.

Respondo AS