Meny Lukk

09.12.2024 McKinsey is advising on Offshore wind strategies and by that confirming the escalating LCOE cost intermittent generation seen on even higher levels for France.

With Offshore LCOE costs at €90-95/MWh and additional 600-1000 B€ in Gridification/Meshification  not yet either finally designed or financed and a potential “forever” subsidy need for additional intermittency due to Cannibalization, one would wonder when the financial reality will be acknowledged.