These are five photovoltaic projects by Dos Grados Capital, Grenergy, Catalpa Solar and Statkraft, due to environmental impacts, technical problems and territorial incompatibilities.
Prado Gris photovoltaic solar park (134.68 MW), a project proposed by Statkraft in Toledo, this project received an unfavorable DIA that highlighted the adverse environmental impacts, especially in relation to local flora and fauna. In addition, an inadequacy in mitigation measures was noted, which led to the rejection of the project